Custom development starts with a clear understanding of the application. Pokcenser evaluates the medium, measuring range, operating conditions, installation, materials, connections, outputs, communication and certification requirements before confirming feasible modifications.
Each project is defined by measurable acceptance criteria and a controlled drawing, specification or configuration code. Changes affecting safety, accuracy or certification require additional review to ensure consistency from sample approval to production.
1. Requirement review — customer application, target specification, quantity, schedule and compliance needs are documented.
2. Technical proposal — Pokcenser confirms the measuring principle, preliminary configuration, development scope and commercial assumptions.
3. Drawing and specification — mechanical interface, electrical connection, output, label and acceptance criteria are agreed.
4. Prototype or sample — a sample is produced for functional and integration testing.
5. Customer validation — the customer tests the product in the intended equipment or process and records any required changes.
6. Design confirmation — approved changes are incorporated into the controlled version.
7. Pilot production — a small batch verifies assembly, test method, packaging and consistency.
8. Series production — orders reference the approved configuration, with change communication for critical components or specifications.
Tooling, minimum quantity, development charges, intellectual-property terms and exclusivity are agreed case by case.
A successful custom sensor must be validated against the requirements that matter in use. The plan may cover measurement accuracy, repeatability, zero and span, response time, proof pressure, leakage, temperature effect, electrical output, communication, connector fit, cable length, environmental protection and compatibility with the customer's controller.
Pokcenser performs factory checks appropriate to the product and agreed scope. The customer is responsible for final validation in the actual medium, machine, tank, pipe, wiring environment and operating cycle unless a separate joint test is arranged.